ROC Nation Distribution Release Plan: 90, 60 And 30 Days Out
How far in advance to upload to ROC Nation Distribution, which of their deadlines you have already missed on a short runway, and what a 90, 60 or 30 day plan looks like. ROC Nation Distribution recommends Set with your rep, not self-serve.
Formed from the merger of the Roc Nation label and Equity Distribution, ROC Nation Distribution signs artists directly rather than running a pure self-serve upload flow. There is no published lead time because your timeline is agreed with a person. That changes the planning problem: the deadline that matters is when you get accepted and onboarded, which is upstream of everything in the 90/60/30 plans.
Recommended lead time: Set with your rep, not self-serve. Stated minimum: Not published. No published lead time. Your timeline is agreed with a person, which makes onboarding the real first deadline.
Before the calendar starts
- Apply and get onboarded. Nothing else on this page is real until that is done.
- Get the delivery lead time from your rep in writing. Do not infer it from other distributors.
- Confirm which Roc Nation services you can opt into, because those carry their own calendars.
- The deal is 85/15 of net profits in your favour, no upfront fees, and you keep your masters. Confirm it against your paperwork rather than a blog post.
How ROC Nation Distribution actually works
- Pre-save: Set with your rep.
- Pitching: Through the company rather than a self-serve form.
- Payout: 85/15 of net profits in the artist's favour, no upfront fees, masters retained.
The 90 day calendar on ROC Nation Distribution
- Day 90: Lock the release date and stop moving it. Every deadline counts backward from it.
- Day 85: Final masters delivered. No more revisions.
- Day 75: Artwork finished at 3000 x 3000, and readable at thumbnail size.
- Day 70: Clear every sample and feature in writing.
- Day 21: Push pre-saves properly. It is the strongest day-one signal you control.
- Day 14: Confirm every piece of release-week coverage has your assets and the right date.
- Release day: Release day. Work the day, do not just watch the numbers.
- Day 21 after: Third asset, and pitch playlists that only take already-released tracks.
ROC Nation Distribution on a 90-day runway: Comfortable
The right runway for an application-based distributor. Apply and get onboarded first, then start the 90-day plan from the day your deal is confirmed.
ROC Nation Distribution on a 60-day runway: Tight
Workable only if you are already signed and onboarded. If you are still applying, the date is not real yet.
ROC Nation Distribution on a 30-day runway: Already late
If you are not already onboarded, this is not a 30-day plan, it is a hope. Confirm delivery timing with your rep before you commit to a date or book anything around it.
What happens if you miss the ROC Nation Distribution deadline
There is no queue to miss, there is a relationship you do not have yet. Building a release date around an unsigned deal is the actual failure mode.
- Do not build a release date around a distribution deal you have not signed yet.
- No published lead time means confirm it in writing with your rep before you book any press.
- The 85/15 split and master ownership are the draw. The tradeoff is that you are on their timeline, not yours.